Bastion angle framed partitioning delivered in 2 weeks
The Brief
A prominent cycle retailer are having a purpose built storeroom constructed adjacent to their new retail outlet at the Lee Valley Velodrome, whilst this is under construction they need a temporary secure storeroom.
The Project
ESE Projects supplied and installed runs of bastion angle frame partition panels which included full height mesh infill. This included:
- 2 off runs 6665mm x 3696mm high, all mesh, including 1 off double door set per run
- 2 off runs 7760mm x 3696mm high, all mesh, including 1 off double door set per run
- 1 off run 2655mm x 3696mm high, all mesh
- 2 off runs 1600mm x 3696mm high, all mesh
All of the steelwork had a galvanised finish and euro cylinder locks to the four doors. The project itself had tight deadline from drawing the plans, sign off and completion all in just over 2 working weeks.
Client Comment
ESE Projects came to see us at short notice and within a matter of days they'd submitted plans and a full breakdown of costings and timescales. Once we gave them the go ahead work started immediately. The finished result is a purpose built secure storeroom within a very tight deadline. I would certainly recommend ESE Projects for any type of industrial fit out.